CES were contracted to carry out the complete MEP package to this listed building which houses the Queens stamp collection.
Working along side the main contractor and consultants, CES worked through this building tough obstacles to ensure all the client’s bespoke requirements could be achieved.
These ranged from a specialist control system, leak detection with the secure archive rooms or a closed control dehumidification requirement.
Bespoke lighting solutions were installed to suit the Heritage building.
The project lasted 12 months on site.